BUILD VS BUY

Build vs. buy: what does document infrastructure really cost?

Estimate what building document generation and digital signature in-house actually costs — in engineering time, money, and delay. Takes about 2 minutes. No signup needed to see results.

0104

What best describes your situation today?

Start from the problem — the model adapts to it.

Build vs Buy

What does document infrastructure really costs?

See what it actually costs to build document generation and e-signature in-house — in engineering time, maintenance, and delay. Built for architects weighing build vs. buy. Two minutes, no signup.

COST CALCULATOR

How is the estimate calculated?

01

Build effort

Effort starts with the document generation engine — the baseline every build needs — then adds the capabilities you select: template management, your e-signature level (simple, advanced, or qualified), an audit trail, and each system you'd integrate. Regulated industries or the compliance-driven scenario add a larger hardening allowance. A complexity multiplier for volume, templates, and variants scales the total.

02

Build cost and timeline

03

Running it after go-live

04

Cost of delay

frequently asked questions

Build vs. buy document infrastructure